Overhead Crane Installation

Challenge: minimal headroom; modified hoist to run in-between bridge rails.

R&M Spacemaster Hoist
New control panel with festoon cable
Installing the hoist
Installing the hoist
1/1

weigh-bridge

installation

Challenge: getting it level on uneven concrete.

Screen Shot 2017-12-06 at 3.08.31 PM
Screen Shot 2017-12-06 at 3.08.31 PM
Screen Shot 2017-12-06 at 3.08.45 PM
Screen Shot 2017-12-06 at 3.08.45 PM
Screen Shot 2017-12-06 at 3.08.37 PM
Screen Shot 2017-12-06 at 3.08.37 PM

PLant

automation

Challenge: moving new panels to higher floor.

400hp Drive lifted to next floor
400hp Drive lifted to next floor
VFD Control Panel
VFD Control Panel
400hp Drives Installed
400hp Drives Installed